Comparison with other obstacle systems reveals RapidBlocs to be a very economically efficient system.
The flexibility of Unistrut allows a contractor to prepare an existing concrete channel floor, attach standard P1000T with chemically fixed anchors and then infill between the track with concrete/grout.